Russian English
search main page map webmaster e-mail

The First Mysovoy tunnel
Construction date 1979 - 1987
Placed into commission 1989
Constructors Tunnel division №16
Length of tunnel 413,9 m
Tunnel section 122 m2
Tunneling method Drill and blast method
Lining Tunnel: cast-in-place reinforced concrete
Location East Siberian railway, Nizhneangarsk-Severobaikalsk section
Location map

General information

First Mysovoy tunnel is situated on the section Nizhneangarsk-Severobaikalsk of Baikal-Amur railway. The tunnel is double-track therefore its cross-section is 122 sq m.

Mysovoy tunnels

©Copyright JSC "BAMTONNELSTROY", 2011